Spa Valley Railway

Broom Lane Bridge Appeal

To raise money required to repair/replace this important bridge on our Railway Line.
£646
raised of £300,000 target
RCN 1039493

Story

Broom Lane Bridge is an old steel structure that is believed to have been built in the 1890s. It is situated between High Rocks & Groombridge and carries our railway over an unclassified road.

The bridge is subject to a speed restriction, introduced following the discovery of corrosion on the main girder flanges, particularly on the web flange angles. Whilst this is not unexpected due to its age, it presents us with a problem. Continued monitoring, enhanced inspections and load testing of the bridge are regularly undertaken to ensure it remains available for rail traffic – however, we need to do something to ensure the bridge remains available for our trains to pass over for many years to come.

There were two options presented to us – either we repair the metal work that is corroding on the bridge, or we replace it for a brand new one. When looking at the options presented to us it became clear that replacement of the bridge was the most cost-effective solution at a price of around £300,000.

Whilst a repair to the affected areas is possible, it would only temporarily extend the bridge’s life, and it would cost the same new structure as the bridge would need to be lifted to enable the repairs to be completed.

We have made the decision that a replacement bridge is the best way forward – but this comes at a price.

The cost of phase 1 which is a certified design of a replacement bridge is circa £30,000. Thanks to savings we have instructed a company that specialises in bridge design, construction, and installation to start immediately with the aim of having this completed in the first quarter of 2025.

Phase 2 is construction and painting of a new bridge estimated to cost circa £70,000. We aim to start this as soon as the design is certified.

Finally, phase 3 is the removal of the old bridge and installation of the new one and this is estimated to be upwards of £200,000.

We won’t be able to do it without your support and we are appealing to anyone who could help to ensure we can complete phase 3 and replace the bridge during 2025. Our target is £300,000!

We know a bridge isn’t glamorous but without it we simply won’t be able to run trains.

Please consider donating to us – we are extremely grateful for your support!

Best wishes

Spa Valley Railway Team

Tunbridge Wells and Eridge Railway Preservation Society and Wealden Railway Company Ltd are Spa Valley Railway.

Share this story

Help Spa Valley Railway

Sharing this page with your friends could help raise up to 3x more in donations

You can also help by sharing this link on

About the charity

Spa Valley Railway

Verified by JustGiving

RCN 1039493
To restore and operate the railway line between Tunbridge Wells West and Eridge together with the rolling stock and infrastructure related to operating a safe railway. We also have an original DEMU that operated services, on the final day for British Rail.

Donation summary

Total raised
£646.00
Online donations
£646.00
Offline donations
£0.00
Direct donations
£646.00
Donations via fundraisers
£0.00

* Charities pay a small fee for our service. Find out how much it is and what we do for it.