Your friends are fundraising. Don't miss out, opt in.

The Britton Fund

15th Annual Britton Fund Ride - Urbana to Nirvana

Our 15th Annual Britton Fund Ride will take place May 2, 2022 in Oakland, California. All riders will roll out together from the Oakland Marriott City Center with a group start around Lake Merritt. Both routes return back to the Marriott
US$15,183
raised of US$25,000 target
Event: 15th Annual Britton Fund Ride, on 2 May 2022
RCN 680634735

Be a fundraiser

Create your own fundraising page and help support this cause.

Start fundraising

Story

Our 15th Annual Britton Fund Ride will take place May 2, 2022 in Oakland, California. From urban street trees to scenic parklands, this years Britton Fund Ride starts in urban Oakland with two route options leading through the rolling East Bay Hills and one option will take a cruise along the shoreline. All riders will roll out together from the Oakland Marriott City Center with a group start around Lake Merritt before splitting off. Both routes return back to the Marriott with an optional tree planting at nearby Lafayette Square Park to end the day.

We have two phenomenal routes for 2022.

Flat Route: The flat route option will head toward the bay, taking riders past Oaklands Jack London Square and into nearby Alameda and Bay Farm Islands for a cruise along the waters edge. Plenty of terrific lunch stops, views, and time to relax along the way. Details: 28 miles and 252 feet of elevation gain. Check out the Flat route here

Road/Hill Route with gravel options: After the group start lap around Lake Merritt, this ride leaves the flatlands and heads up and over the hill into the East Bays bucolic regional park system. This route is based around taking a classic road ride through the areas best scenic loop. Expect some long hills, sweeping descents, striking views, and a constantly shifting ecology of local and introduced trees that all now call the California hills their home. Although this is only a metric century this year, be prepared to feel every kilometer. With that said, there is a pretty good exit point about halfway through after we have finished the Skyline Boulevard and Redwood Road loop. For those ready for the whole package, the best climb sections are saved for the end as the route rolls along Pinehurst Road and up toward Berkeleys Grizzly Peak and Tilden Park. We take a final loop through Tilden Park before descending back to the hotel to kick off the conference. Details: 63.24 miles and 6,415 feet of elevation gain. Check out the Road route

Share this story

Help The Britton Fund

Sharing this page with your friends could help raise up to 3x more in donations

You can also help by sharing this link on

Donation summary

Total raised
US$15,183.00
Online donations
US$15,183.00
Offline donations
US$0.00
Direct donations
US$280.00
Donations via fundraisers
US$14,903.00

* Charities pay a small fee for our service. Find out how much it is and what we do for it.