Phase 1
A total of £1.6 Million pounds was spent on this phase which mainly
consisted of work relating to the foundations and basement.
Phase 1 - Breakdown
Work started in the Summer of 2023
Construction site was prepared for all foundation work and piling.
Alhamdulillah, the piling work was successfully completed in the Autumn of 2023.
This was an expensive but an important operation and milestone. As all the work below ground is completed, all future work will be above ground and easy for you to see the progress.
Underground waste water collection tank, drainage system and
key infrastructure supplies are currently being installed/.
Assembly of structural steel work: Erection of structural steel work consists of the assembly of steel components into a frame on-site. Process can involve lifting and placing structural elements into position, then connecting them together.
The total cost for this phase was £1.6 Million Pounds.
Phase 2 –
Assalamu Aliakum Warahmatullahi Wabarakatuh,
We hope this message finds you in good health and high
spirits. We are pleased to report that with your generous donations and unwavering support, Phase 1 of the Mecca Mosque New Build project is soon to be complete. We express our gratitude to all those who contributed to this accomplishment.
Now, we would like to draw your attention to the second phase of our project. We find ourselves in a momentous phase of constructing our mosque. By the mercy of Allah, considerable headway has already been made. We have successfully completed initial tasks, such as laying the foundations and reinforcing the structure's strength. Now, our attention turns to constructing its walls and roof and making it watertight.
This marks a crucial time where our dream of a mosque transforms into reality. With the framework firmly established completing this stage is an achievement, allowing us to begin adorning the next phase of our mosque.
As we embark on this phase, we are filled with excitement and dedication to our vision. The placement of 25-meter diameter petalled dome, one of the largest designed for an Islamic building in the UK will be placed during Phase 2.
With renewed energy, let’s continue in fulfilling our duty. Let us continue to work together, not only constructing a physical structure but a place of worship, education, support, community engagement, and architectural excellence.
Let us open our hearts and contribute generously to this noble cause.
This endeavour holds significance not only for us and future generations but also for our Aakirah, In Sha Allah!